Reconstruction of mixer 3 for a moistened ash mixture at the Poříčí Power Plant

Date of implementation: 2022

Description

Dismantling of the existing FP 30 mixer, modification of existing equipment and steel structures. Installation of new equipment of the new mixing line No. 3 for the event "Reconstruction of mixer 3 for the moistened ash mixture in EPO"

  • Customer: ECO-BUILDING BRNO s.r.o.
  • Termin: 2022
  • Place: Poříčí