Description
Dismantling of the existing FP 30 mixer, modification of existing equipment and steel structures. Installation of new equipment of the new mixing line No. 3 for the event "Reconstruction of mixer 3 for the moistened ash mixture in EPO"
- Customer: ECO-BUILDING BRNO s.r.o.
- Termin: 2022
- Place: Poříčí